Palletizing line for 97‑specification products

97 Palletizing Line Layout: 19.46 meters long, 17.92 meters wide, Options 5–8.

Suitable for the rear section of a 97‑specification wood veneer plant, enabling automatic board collection, sorting, and palletizing. This diagram highlights the rounding return‑to‑center layout, equipment connections, and forklift transport dynamics.

97 Palletizing Line Layout: 19.46 meters long, 17.92 meters wide, Options 5–8.
01

First, Examine the Overall Site Layout

When reviewing the site layout, first examine the workshop’s length and width, the feed direction, the peeling machine’s location, the downstream veneer receiving and stacking area, and the forklift transport routes to determine whether the equipment can be smoothly implemented.

97 palletizing line layout 5-8, used for initial discussions on site dimensions, equipment arrangement, and material-handling flow.
02

Re-examine whether the equipment combination matches the production line

Even the same specifications may require layout adjustments due to variations in wood input, slicing orientation, board discharge methods, staffing arrangements, and forklift routes. Web page illustrations serve only as approximate reference designs.

03

Information to provide during communication

It is recommended to provide factory dimensions, column positions, doorways, power and air supply points, locations of existing equipment, target specifications, expected capacity, and forklift access routes to quickly determine whether adjustments to the plan are necessary.